Final Engineering for the 138 KV Transmission Line 8 de Agosto – Tingo María Hydroelectric Power Plant and Substations. Includes Environmental Impact Study and CIRA of the Transmission Line and the 8 de Agosto Hydroelectric Power Plant of 19 MW
por admin | Abr 2, 2025 | Huánuco
