Outstanding experience

PROFILE LEVEL STUDY OF NINE HYDROELECTRIC PROJECTS
ANDES GENERATING CORPORATION S.A.C.

BACKGROUND AND SCOPE OF SERVICES

The main characteristics of the nine hydroelectric projects are as follows:

CH 1: Located in Tarma, flow rate 3 m3/s, power 6 MW

CH 2: Located in Tarma, flow rate 10 m3/s, power 8.2 MW

CH 3: Located in Jauja, Flow 11 m3/s, Gross Head 56.5 m and power 51.6 MW

CH 4: Located in Jauja, Flow 3.00 m3/s, Gross Head 315 m and power 7.6 MW

CH 7: Located in Chanchamayo, Flow 3 m3/s, Gross Fall 615 m and power 5 MW

CH 8: Located in Jauja, Flow 7 m3/s, Gross Head 321 m and power 19.9 MW

CH 10: DOES NOT PRESENT FAVORABLE CONDITIONS

CH 11: Located in Jauja, Flow 2 m3/s, Gross Head 785 m, power 19.9 MW

CH 12: Located in Jauja, Flow 4.5 m3/s, Gross Head 570 m, power 19.8 MW

Compilation and review of existing information was carried out; Visit to the project area; Verification and complementation of existing hydrological and topographic information; Evaluation of the geological aspect of the project areas; Ratification or rectification of the alternative identified by the Client in the cabinet; Preliminary determination of the costs of the selected scheme; Determination of the economic indices of the nine projects.