Sector

Outstanding Experience

T. L. 220 KV HPP. RUCUY FRANCOISE AND RUCUY SUBSTATIONS
EMPRESA DE GENERACION ELECTRICA RIO BAÑO SAC

+

BASIN OF THE SUMBAY RIVER – CHALHUANCA DAM
EGASA

+

T. L. 60 KV EDEGEL
ABENGOA PERÚ S.A.

+

HPP. MONZON (360 kW)
District Municipality of Monzón

+

TRUJILLO NORTE AND PIURA OESTE SUBSTATIONS 220 KV
ETECEN

+

HPP. 8 DE AGOSTO OF 19.83 MW EL CARMEN 8.60 MW AND NUEVA ESPERANZA 9.34 MW
GENERACION ANDINA S.A.C.

+

T. L. 220 KV CARHUAMAYO – PARAGSHA – CONOCOCHA – KIMAN AYLLU- CAJAMARCA AND SUBSTATIONS
ABENGOA TRANSMISION NORTE S.A. ATN

+

HUMALSO DAM
Special Project Pasto Grande / INADE

+

PACHACAYO RIVER AND SUBBASIN OF THE HUARI RIVER
ELECTROPERU S.A.

+

TECHNIFIED IRRIGATION SYSTEM BY DRIPPING: GGE MINACAL – SECTOR 15, CHICAMA DISTRICT– VALLEY OF CHICAMA, REGION OF LA LIBERTAD
SUBSECTORIAL IRRIGATION PROGRAM (PSI)

+

NORTHERN AND SOUTHERN BRANCHES FOR THE DRINKING WATER SUPPLY FOR THE DISTRICTS OF THE NORTHERN AND SOUTHERN CONES FROM THE CITY OF LIMA
Lima Water and Sewerage Company - SEDAPAL

+

HPP. QUITARACSA I (114.6 MW)
QUITARACSA S.A. – COMPANY OF ELECTRIC POWER GENERATION

+